Products

Agents for every organisation at the airport.

Ground handlers first, then security providers and airport operators. For each: what the agent does, from which records, what it delivers, the indicator you judge it on — and the unit we bill.

01 · Ground handlers

Three processes where the evidence is worth money.

You work under contract with the airlines and under the airport’s rules — and from 27 March 2028 under EU safety rules of your own. Every turnaround produces milestones, every occurrence a report, every member of staff a training record, and every dispute comes down to the records.

1.1 · Proof of service

Every turnaround documented against the contract, before anyone disputes it.

Your SGHA and its service-level annex set what you owe each airline, station by station. The agent reads the turnaround as it happens and compiles the file that shows what was delivered, when — and, when there is a delay, the evidence on whose it was.

Each flight
Compiles the service file

On-block, doors, unloading, loading, off-block: each milestone set against the service standards agreed with the airline; deviations timestamped, with the cause proposed from the records.

Each delay
Prepares the evidence on the delay code

When a delay is attributed to handling, the milestones, messages and requests that confirm or contest it, assembled for the station manager to sign or send back.

Each extra service
Catches what was delivered but not billed

Towing, extra staff, services requested on the day: reconciled with the charges in Annex B, the billing line prepared for approval before the billing run.

Monthly
Compiles the service-level report per airline

Each indicator of the service-level agreement, calculated from the flight files, every figure traceable to the turnarounds behind it.

From
A-CDM milestonesturnaround timestampsdeparture and load controlservice requestsSGHA Annex Bshift log
Delivers

A service file per flight · evidence packs on disputed delays · billing lines for approval · a monthly service-level report per airline

You measure

Turnarounds with a complete file · delays and deviations contested with evidence · extra services billed

We bill

Per documented turnaround, beyond the volume included in the station fee

Framework

IATA Standard Ground Handling Agreement — Annex A (services), Annex B (location, services, charges) · service-level agreement on the AHM 803 model · EUROCONTROL A-CDM milestones

1.2 · Damage and occurrences

From the ramp event to the report, inside 72 hours, with the evidence attached.

More than 29,000 aircraft ground damage events were reported to IATA in 2025. In the EU, each one means a report due within 72 hours, often a claim, and a question the airline will ask. The agent assembles the answer while the facts are fresh.

Each occurrence
Drafts the report

Ground damage, incorrect loading, dangerous goods, fuel spillage: the report coded in the ECCAIRS taxonomy, the 72-hour deadline computed, statements, photos and equipment data attached. Filing remains a human act.

The same day
Opens the claim file

The sequence of events rebuilt from the milestones and the rosters, the evidence organised for the airline and the insurer, the questions of liability laid out against the contract.

Within 30 days
Follows the analysis to its conclusion

Where the analysis finds a safety risk, preliminary results are due to the authority within 30 days and final results in principle within three months: the agent tracks both, and the corrective action until a person closes it.

Monthly
Shows where damage comes from

Damage and loading errors by cause, stand, shift and type of equipment — the figures your safety review needs, each one traceable to its reports.

From
ramp incident logphotosequipment datarostersloadsheetsturnaround timestamps
Delivers

Reports ready to sign · claim files · corrective-action tracking · a monthly damage review

You measure

Reports filed within 72 hours · complete claim files · overdue corrective actions · damage events per 1,000 turnarounds

We bill

Per occurrence file, beyond the volume included in the station fee

Framework

Reg. (EU) 376/2014 — art. 4 (ground handling staff report within 72 hours) and art. 13 (analysis and follow-up) · Implementing Reg. (EU) 2015/1018, Annex IV · IATA, 19 May 2026: ground damage and loading error figures for 2025

1.3 · The 2028 rules

Part-ORGH readiness, built from your operation rather than written for the audit.

From 27 March 2028, Delegated Regulation (EU) 2025/20 applies to ground handling organisations: a declaration, a management system, safety reporting, competent personnel, documents and records. The agent builds that evidence continuously, so the declaration describes what you actually do.

First month
Maps every requirement to your procedures

Each point of Part-ORGH set against your manuals, records and contracts: what already exists, what is missing, who owns the gap. The rules, point by point

Every week
Keeps personnel and qualification records

Airside driving, dangerous goods, de-icing, security: who is qualified for what, which expiries fall due, who is rostered with a lapsed qualification.

Continuously
Follows every finding to closure

Audit findings, occurrences, changes to the operation: each one with its owner, its deadline and its corrective action, until a person closes it.

Every day
Reconciles equipment checks and handovers

Daily checks of ground support equipment, shift handovers: what was done, what is missing; the maintenance ticket prepared.

Before the audit
Assembles the ISAGO, airline and authority packs

Evidence organised the way each auditor will ask for it, with the register of variations from the IATA Ground Operations Manual (IGOM) and the action plan.

From
ground handling manualtraining recordsrostersaudit findingsequipment maintenanceoccurrence reports
Delivers

A Part-ORGH gap register · a qualification register · findings and corrective-action tracking · audit packs · a draft declaration for your accountable manager to sign

You measure

Gaps closed · lapsed qualifications on duty · findings per audit · overdue corrective actions

We bill

Per person on the register, per month, beyond the volume included in the station fee

Framework

Delegated Reg. (EU) 2025/20 — Part-ORGH, applicable from 27 March 2028 (information security management, ORGH.MGM.201: 27 March 2031) · Implementing Reg. (EU) 2025/23 — authority oversight · IATA ISAGO, registration valid 24 months · IATA IGOM

02 · Security providers

Certifications, tests and incidents kept current every day.

Your screeners are certified, trained recurrently, tested; your equipment is tested daily; your incidents are reported within 24 or 72 hours. Every requirement produces a record — and the airport and the authority will both ask for it.

Weekly
Keeps the certification and training register

Screener certification, initial and recurrent training, clearances: who is current, which expiries are due, which files are complete for the authority; sessions to schedule proposed. The agent never issues or revokes a certification.

Every day
Reconciles equipment tests and checkpoint logs

Daily tests of walk-through detectors, X-ray units and trace detectors, handovers, checkpoint incidents: what was done, what is missing, what is inconsistent; the ticket prepared.

Each quality-control test
Follows the result through to the corrective action

Airport, authority or internal tests: result logged, cause proposed, corrective action followed until a person closes it.

Each incident
Prepares the report

In the common template: class proposed, deadline computed by impact (24 hours, 72 hours or monthly), sources attached. Filing remains a human act.

Monthly
Compiles the report for the airport

Tests, waiting times, incidents, trained headcount: the report your contract requires, every figure traceable.

From
equipment exportsrosterstraining recordstest resultsshift logmailbox
Delivers

Certification register · morning exceptions list · corrective-action tracking · reports ready to sign · monthly report

You measure

Expired certifications on duty · share of due tests logged · overdue corrective actions · time to report

We bill

Per certified person on the register, per month, beyond the volume included in the site fee

Framework

Reg. (EC) 300/2008 — national quality control programme · Implementing Reg. (EU) 2015/1998 — recruitment, training and certification; equipment · Reg. (EU) 2026/247, point 19

03 · Airport operators

Six operational areas, inside your systems.

Airside, security, baggage, passengers, safety, environment: for each area, what the agent does every day, from which systems, what it delivers, and the indicator you already track. Billed per site.

3.1 · Airside and movement areas

Every inspection logged, every finding turned into a work order.

Inspections, runway condition, wildlife, FOD, lighting: the work gets done. What is missing is the time to log it, reconcile it and turn it into work orders.

Every day
Reconciles inspections due with inspections logged

Per area and per inspection round: done, missing, incomplete. Every finding — lighting, markings, pavement, FOD — becomes a work order drafted in your CMMS, with the position and the photo.

Each assessment
Prepares the runway condition report

From the observations entered by the duty officer: a draft report with the runway condition code per third, to validate before transmission. It never transmits itself.

Each occurrence
Drafts the occurrence report

Wildlife strike, FOD, runway incursion, damage by ground equipment: the report drafted in the right taxonomy, deadline computed, sources attached, ready to sign.

Monthly
Keeps the wildlife log and the statistics

Sightings, dispersals, strikes per movement; the periodic report compiled from the log, every figure traceable.

From
inspection logsCMMSAODBwildlife logMETARshift log
Delivers

Drafted work orders · draft runway condition report to validate · occurrence reports ready to sign · wildlife log and monthly report

You measure

Time to clear lighting faults · time from finding to work order · inspections logged over inspections due · wildlife strikes per 10,000 movements

Framework

Reg. (EU) 139/2014 — ADR.OPS.B.015 (monitoring and inspection of the movement area), ADR.OPS.B.020 (wildlife), ADR.OPS.B.037 (surface condition) · Global Reporting Format applicable since 12 August 2021 · Implementing Reg. (EU) 2015/1018, Annex IV

3.2 · Security

Tests, certifications and incidents ready before anyone asks.

Screening checkpoints, access control, ID passes, daily tests: every requirement produces a record, and every missing record becomes a finding at the next audit.

Every day
Reconciles equipment tests and checkpoint logs

Daily tests of walk-through detectors, X-ray units and trace detectors, handovers, checkpoint incidents: done, missing, inconsistent. The ticket to maintenance or IT is drafted with the log excerpt.

Each incident
Prepares the security incident report

In the common template: class proposed, deadline computed — 24 h, 72 h or monthly by impact —, sources attached. Filing with the authority remains a human act.

Weekly
Keeps the register of certifications and passes

Initial and recurrent training, certifications, airport ID passes: who is current, who expires within 30, 60 and 90 days, which files are complete for the ID office. It never issues or revokes anything.

Before the audit
Assembles the evidence pack

The way the national quality control programme auditor will ask for it: procedures, records, tests, training — with the gap register and the draft corrective action plan.

From
screening equipment exportsaccess controlID pass registerrosterstraining recordsshift log
Delivers

Morning exceptions list · drafted tickets · incident reports ready to sign · up-to-date certification register · evidence pack

You measure

Tests logged over tests due · time to report · expired certifications on duty · findings per audit · hours of audit preparation

Framework

Reg. (EC) 300/2008 · Implementing Reg. (EU) 2015/1998 — access control, staff training and certification, equipment · Reg. (EU) 2026/247, point 19 — reporting within 24 h / 72 h / monthly, national process from 1 January 2028

3.3 · Baggage

Every missing bag explained, every system stoppage logged.

When a bag goes missing, the explanation is scattered across scans, flight data and the system log. When a line stops, the incident report waits.

Each missing bag
Reconstructs the journey

Scans at check-in, loading, transfer and delivery, flight data, system events: where and why the bag left its path. The file is ready for the airline or the handler, with a proposed cause.

Every day
Logs system alarms and incidents

Hold-baggage screening alarms, conveyor stoppages, jams, missed reads: the incident report drafted from the system log, the maintenance ticket prepared.

Each flight concerned
Prepares the baggage reconciliation

Unaccompanied hold baggage identified from check-in and boarding data, for the security officer to decide. It never triggers an offload itself.

Monthly
Compiles the performance report

Mishandled bags by airline, by cause and by point in the journey; system incidents and downtime — every figure traceable to the files behind it.

From
baggage system supervisionbaggage reconciliationairline scansAODBhold-baggage screeningCMMS
Delivers

A file per bag · incident reports · drafted tickets · reconciliation lists · monthly report

You measure

Mishandled bags per 1,000 passengers · time to reconstruct a file · system downtime · alarms handled and traced

Framework

Implementing Reg. (EU) 2015/1998, Chapter 5 — screening, protection and reconciliation of hold baggage · IATA Resolution 753 — airlines track every bag at four points of the journey, with airports and handlers · Implementing Reg. (EU) 2015/1018, Annex IV

3.4 · Passengers and PRM

Assistance on time, every complaint answered on the facts.

The airport managing body is responsible for assistance to persons with reduced mobility and publishes its quality standards. Every case waits for a reply someone can stand behind.

Each request
Tracks every PRM assistance against the standard

Airline pre-notifications, pick-ups, waiting time at the meeting point: every case tracked against your published quality standards; deviations flagged to the provider in time to act.

Every day
Reconciles queues with the flight schedule

Waiting times at screening and check-in reconciled with flights and open positions; the overruns documented for the morning meeting.

Each complaint
Classifies and drafts the reply

Complaints and lost-property requests classified, a case opened with its deadline, a draft reply from your procedures. A person reviews and sends.

Monthly
Compiles the quality reports

PRM assistance, queues, complaints: the reports for the airport users’ committee and the authority, compiled from the register, every figure traceable.

From
PRM pre-notificationsprovider’s toolqueue measurementCRM · mailboxAODB
Delivers

Case register · flagged deviations · replies for approval · monthly reports

You measure

PRM assisted within the standard’s deadline · screening wait times · complaints answered on time · average reply time

Framework

Reg. (EC) 1107/2006, art. 9 — quality standards set and published by the managing body · ECAC Doc 30, Part I · your published service commitments

3.5 · Safety and compliance

A safety management system that lives every day.

Reports within 72 hours, hazard register, corrective actions, the aerodrome manual, audits by the authority. The evidence exists; it is scattered across ten systems and three mailboxes.

Each occurrence
Drafts the report within 72 hours

From the shift log, the radio or the mailbox: report in the taxonomy, class proposed, deadline computed, sources attached. The responsible person edits and signs.

Weekly
Keeps the hazard and action register

Occurrences grouped, hazards updated, corrective actions followed until a person closes them, reminders drafted.

Monthly
Compiles the safety indicators

For the safety review: occurrences by type, incursions, FOD, wildlife strikes, overdue actions — from the register, not from memory.

Before the audit
Prepares the pack and the manual gaps

Evidence pack the way the authority will ask for it; gaps between the aerodrome manual and the practice on record; draft corrective action plan.

From
shift logSMS softwaretraining recordsCMMSaerodrome manualexercise reports
Delivers

Occurrence reports ready to sign · up-to-date hazard register · monthly indicators · audit pack · action plan

You measure

Share of reports filed within the 72-hour deadline · overdue corrective actions · findings per audit · hours of preparation

Framework

Reg. (EU) 376/2014, art. 4(7) and art. 13 · Implementing Reg. (EU) 2015/1018, Annex IV · Reg. (EU) 139/2014 — management system and aerodrome manual

3.6 · Environment and neighbours

Every complaint linked to the flight, every report compiled from the data.

Noise complaints, flight tracks, periodic reports, emissions monitoring, local commitments: obligations that are proven with data you already produce.

Each complaint
Links the complaint to the flight

Time, place and description reconciled with movements and noise measurements; a draft reply grounded in the facts, for a person to approve.

Monthly
Compiles the environment reports

Complaints by area and period, night movements, noise measurements, energy and emissions: the reports for the consultative committee and the authority.

Quarterly
Prepares the data for your declarations

Extracts, tables and supporting documents for your declarations and certifications, every figure traceable to its source.

From
noise and track monitoringAODBcomplaints portalenergy data
Delivers

Replies for approval · complaints register · monthly reports · data packs

You measure

Complaints answered on time · average reply time · reports delivered on time

Framework

Directive 2002/49/EC — noise maps and action plans · Reg. (EU) 598/2014 — noise-related operating restrictions · your local commitments

04 · Other actors

The same agents, for everyone who shares these obligations.

Airlines and stations

The turnaround report and service evidence on the airline side, the station’s occurrence reports, baggage claim files — in the station’s own tools.

Regulated agents and cargo

The register of trained and certified staff, consignment security declarations, the file ready for the authority’s inspection — Implementing Reg. (EU) 2015/1998, Chapter 6.

Maintenance contractors

Preventive-maintenance evidence for lighting, security equipment and conveyors, reconciled with the plan; work orders created from inspection findings.

Pricing

You pay for documented work, never for seats.

We publish how we bill before we publish a price: the price depends on the scope, and we quote it before day one. The structure does not change.

Pilot project

One process, six weeks from the day access opens, one indicator agreed before day one. A fixed price for a defined scope, quoted before we start. If the target is not met, we stop — and you keep everything produced.

In production

An annual fee per station or per site — connections, the ledger and a volume of documented work included — then a price per unit beyond it: a documented turnaround, an occurrence file, a person on a register. Never per seat, never by the hour.

Our commitment

The pilot’s indicator is written into the production contract. If it slips for reasons attributable to us, a service credit applies, as the contract sets out. Your ledger and deliverables stay in your systems, in open formats, whatever happens.

The rules every agent shares.

A Khelion agent is not a chatbot. It has inputs, outputs, a warrant, and a person it hands over to.

It may

Read the systems the warrant names. Draft, classify, reconcile, compute a deadline, prepare a work order, a ticket, a reply, a report. Write only where the warrant allows it.

It never

Files a report with an authority. Transmits a runway condition report. Issues or revokes a pass. Triggers an offload. Sends a letter. Closes a ticket or a finding. Changes what a witness wrote.

It records

Every action, every refusal and every stop in a ledger you export. Outside the warrant, it stops and notifies a named person — with its reasoning attached.

Your own process

Not on the list? We build the agent.

A local reporting rule, a contractor onboarding, a recurring return to an authority. If it is written down, repeated, and someone can say what “done” looks like, we build the agent around it — same warrant, same ledger. How the pilot project runs

Start a pilot project